It was great to be back with the volunteers at Back The Track recently and officially cut the ribbon on their newly installed steps.
The Back The Track initiative now means that more than 5 miles of track has been cleared on the former South Staffordshire railway line opening up new walking and cycling routes for the benefit of residents, the new steps now mean that walkers can climb the bank to the canal with relative ease.
Congratulations to all the volunteers who have made this possible and thank you for another excellent visit.